UGL Infrastructure

ABN: 96 096 365 972

Contacts:


Rob Hawketts

- General Manager - Defence

Email: rob.hawketts@ugllimited.com


Andrew Fazel

- Operations Manager - Defence

Email: Andrew.Fazel@ugllimited.com


Ph:

(02) 8925 8925

Fax:

(02) 8925 8926

Address: 

Level 6,
40 Miller Street, North Sydney NSW 2060

Website:    

http://www.ugllimited.com

Email:

Branches

  • Branch: Western Australia
    Address: Lot 449, Mandurah Road, Kwinana WA 6167
    Fax: (08) 9219 5555
  • Branch: NSW
    Address: 373 Horsley Road, Milperra NSW 2214
    Fax: (02) 9774 7492

Capabilities

UGL Infrastructure has the capacity to produce between 50t and 200t on fabricated products per week, depending upon complexity and project requirements. We continue to manage a pre-approved group of fabrication subcontractors for structural steel fabrication and we maintain a capacity for value added fabrication of high quality pipe spooling, vessels and other unique items - offering our clients a wide variety of manufacturing options.

Cage Code

Z8545

This company also offers the following services

Last Updated: May 16, 2012

Request listing change


Related Content

News: Joint venture between Babcock and UGL formed

The joint venture between Babcock and UGL will provide naval surface ship repair and maintenance services for the ANZAC Ship Group Maintenance Contract.

Naval Ship Management (Australia) Pty Ltd is an incorporated joint venture set up by Babcock Pty Ltd and UGL Infrastructure Pty Ltd for surface ship repair and maintenance services for the ANZAC Ship Group

News: Babcock and UGL strike up a new JV

The joint venture between Babcock and UGL will provide naval surface ship repair and maintenance services for the ANZAC Ship Group Maintenance Contract.

Babcock Pty Ltd and UGL Infrastructure Pty Ltd have formed Naval Ship Management (Australia) Pty Ltd, an incorporated joint venture, to provide naval surface ship repair and maintenance services.

latest comments

1:25PM "What a question! Remember this is the second time round the bush (atleast). Last time the answer came up as..."
Johnno on Lack of competition on BFA
4:46PM "From the budget..........'An additional $700M for Collins class sustainment'. What are they doing now? If y..."
Johnno on Future Submarine Industry Ski...
2:47PM "so let me get this straight, the budget 'surplus' has been paid for by moving anything i care about project wi..."
Sceptic on Defence Budget 2012/13: Proj...